Product Alert for Waterous Fire Hydrants

Product_alert_waterous Hydrant upper operating rods and grease in the operating chamber of Waterous Model Pacer and Trend fire hydrants that bear year markings of 1999 through 2004 must be replaced. American Flow Control will hire an authorized contractor to do the repairs at no expense to the owner, or it will provide a free replacement kit and a labor allowance for each hydrant repaired.

For Customer Questions, please call 866-683-3911 Monday-Friday, 8:00 a.m. to 4:30 p.m. CST, e-mail waterousquestions@waterousco.com or click on the links below for additional information and to order remediation parts and supplies.

Hydrant Rod Replacement Order Form

Please correct the following errors and then resubmit

General Information

Hydrant Specifics

?
?
?

Please enter any other applicable specifications or comments.




CLOSE

Hydrant Models

Product Model W67-250 and WB67-250

Product Model

Product Model

Product Model

CLOSE

Opening Direction

Pic_alertpop_openside

Pacer and Trend model fire hydrants are supplied to open by turning the operating nuts either of two different directions and the threads of the upper operating rod must be ordered to have the correct corresponding right or left-hand threads. The convention is to call these different directions “open-left” and “open-right”.

Open-Left: To open the main valve of the hydrants, the operating nut is turned in a counterclockwise direction, as viewed looking down at the nut from the top of the hydrant.

Open-Right: To open the main valve of the hydrants, the operating nut is turned in a clockwise direction, as viewed looking down at the nut from the top of the hydrant.

Raised Cast Markings: Notice the direction of the arrow and the word “OPEN”, which are raised cast markings found on the front and back of the hydrant top as shown in the drawings.

CLOSE

Opening Direction

Pic_alertpop_length

Traffic style fire hydrants are designed so that the upper standpipe and upper operating rod break-off from the lower standpipe and rod when struck by a vehicle, so the upper standpipe is called a “break-off standpipe”. Traffic style Pacer and Trend model fire hydrants are supplied with various upper standpipe lengths. Replacement rods must be ordered according to the length of the break-off standpipe.

See the drawing for instructions for determining the particular break-off length of the hydrants that are to have the upper rods replaced.

Note that the Trend model uses only two different break-off lengths, while the Pacer models use five different lengths.

Request More Information

Add specific model info if applicable

Tell us more

Print Page